Construction packages

A useful starting point, not a vague promise.

Every quotation is shaped by the site, design and specification. The starting figure helps frame an early conversation before a detailed proposal is prepared.

01 Indicative starting rate

Plan the scope before fixing the number.

We first understand the plot, intended space, structural requirements and finish level. The final proposal then records inclusions, exclusions, milestones and responsibilities.

Request current specifications

Packages currently start from

₹1,950/ sq. ft.*
  • Architectural planning
  • Structural design coordination
  • Material and execution specifications
  • Stage-wise progress updates
  • Quality checks
  • Handover support
Get current specifications *Indicative starting price. Final cost depends on location, soil conditions, design, built-up area, specifications and statutory requirements.

02 What changes the estimate

The site and specification shape the final value.

The legacy website listed several package rates. Those figures are not presented as current until Levelplay confirms an official rate card.

01

Plot location and access

02

Soil and site conditions

03

Built-up area and number of floors

04

Architectural and structural requirements

05

Material and finish selections

06

Approvals and external works

03 Early budget planner

Turn an area into a starting conversation.

This planning tool is not a quotation. It gives you a reference value to discuss with the Levelplay team.

sq. ft.
50010,000 sq. ft.

Indicative starting construction value

₹39,00,000Calculated at ₹1,950 / sq. ft.Discuss this estimate

Planning reference only—not a quotation. Plot conditions, design, number of floors, approvals, material selections, services and external works can change the final value.

04 Warranty reference

Published package support

The legacy packages state a one-year construction guarantee and ten-year waterproofing warranty, issued on stamp paper. Exact coverage, exclusions and claim conditions follow the signed contract.

05 Typical exclusions

Confirm before agreement

Government fees, some sanction charges, site utilities, road-cutting charges, external works and interiors may be separate. The current proposal must identify every inclusion and exclusion.

WhatsApp us